Specification for installation and use of polymer preparation system

 

The polymer preparation system is developed to meet the needs of customers. It is widely used in power plants, chemicals, water plants and other sewage treatment systems that need to add purifiers and flocculants. It can perform continuous and stable dosing operations for sewage treatment.

Specification for installation and use of polymer preparation system

Specification for installation and use of polymer preparation system

Precautions before using the polymer preparation system Installation specifications:

1. During installation, it is not allowed to damage the parts, and some parts that are prone to collision and damage should be properly protected.

2. Before installation, confirm that the transmission device is intact, check the completeness of the equipment, and check the abnormal phenomena such as the deformation of the stirring shaft.

3. The use environment of the reducer should ensure good ventilation and cooling conditions, and check the installation size.

4. Refer to the drawings and the actual situation on site to predict the pipeline connection position, and select the appropriate direction.

5. After placing it, hit expansion bolts on the ground to fix it. Then connect the corresponding pipes.

6. The motor should be waterproof, dustproof and grounded.

7. On-site installation and construction personnel and users should be familiar with the structure, performance and technical requirements of this product, and strictly abide by the operating procedures.

The precautions before using the polymer preparation system are as follows:

1. The water purifier should meet the requirements of the standard.

2. Check whether the components are normal and whether there is leakage.

3. Check whether the switch position of each valve is correct.

4. Check whether the safety valve and back pressure valve are normal and flexible.

5. Set the metering pump according to the metering pump manual.

6. Check whether the wiring of each pump is correct and whether the steering of the pump is correct.

7. Turn on the power switch and observe whether the display and the status of each indicator light are normal.


 

Note: You can write to us or leave a message at any time to get technical support or solutions.