After the arrival of the dry powder dosing device, we need to check and accept it, and then install it after confirming that it is qualified. The installation work should be carried out according to the regulations, and the installation method is as follows:
1. When the dry powder dosing device is in place, the levelness and perpendicularity of the whole machine shall be checked with a frame level, and the allowable error is 1/1000.
2. After the machine is leveled, cement mortar shall be poured into the anchor bolt hole of the metering pump. In order to make the cement set well, it shall be kept wet and slowly consolidated. After the cement reaches the strength, the nuts shall be tightened evenly, and then the machine bottom joint gap shall be filled with cement and polished.
3. After the escalator is aligned, fix it on the ground with expansion bolts.
4. Connect the tap water pipe to the reserved pipe on the dosing device. Do not install a ball valve to control the water flow. Instead, use a stop valve or gate valve. Connect the overflow drain pipe to the sewer. Connect the pipe between the solution tank and the metering pump. If only one interface is used, block the redundant interface or combine two interfaces into one interface.
5. Connect the power supply in the electric control box and the tap water supply.
The manufacturer of the dry powder dosing device kindly reminds you that you need to debug the installation effect after installation.
Note: You can write to us or leave a message at any time to get technical support or solutions.